Skylab Mission Report: Third Visit - Space Station Mission by Carr, Gibson, Pogue, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs, Comet Kohoutek

Nonfiction, Science & Nature, Technology, Aeronautics & Astronautics, Science, Physics, Astrophysics & Space Science
Cover of the book Skylab Mission Report: Third Visit - Space Station Mission by Carr, Gibson, Pogue, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs, Comet Kohoutek by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781476116945
Publisher: Progressive Management Publication: May 19, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781476116945
Publisher: Progressive Management
Publication: May 19, 2012
Imprint: Smashwords Edition
Language: English

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the third manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The third visit space vehicle was launched at 14:01:23 G.m.t. (9:01:23 a.m. e.s.t.) on November 16, 1973, from Launch Complex 39B at the Kennedy Space Center, Florida. The vehicle was manned by Lt. Col. Gerald P. Carr, Commander; Dr. Edward G. Gibson, Scientist Pilot; and Col. William R. Pogue, Pilot. The launch was originally scheduled for November 10, 1973; however, an inspection of the launch vehicle revealed cracks in the first stage fins and the decision to replace all of the fins necessitated the launch delay. The planned duration of the visit was 56 days with the option of extending it to a maximum of 84 days, which was achieved.

Orbital activities included four periods of extravehicular activity totaling approximately 22 1/4 hours. The first extravehicular activity was accomplished on visit day 7 and lasted 6 hours 34 minutes. The primary purpose of the activity — installation of film magazines in the Apollo Telescope Mount cameras — was accomplished satisfactorily. Other tasks accomplished included performing corrective maintenance on the experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) antenna, deploying panels of experiment D024 (Thermal Control Coatings), deploying impact detectors of experiment S149 (Particle Collection), deploying detector modules of experiment S228 (Trans-Uranic Cosmic Rays), and deploying collector assemblies of experiment S230 (Magnetospheric Particle Composition).

The second and third extravehicular activities were conducted on visit days 40 (Christmas Day) and 44 to allow extravehicular photography of the Comet Kohoutek prior to and after perihelion. The instruments for experiments S201 and T025 were used for this purpose. Experiment S020 (X-Ray/Ultraviolet Solar Photography) was also conducted on the second and third extravehicular activities. Other tasks performed during the visit day 40 extravehicular activity consisted of replacing film magazines in the Apollo Telescope Mount cameras, pinning open the door of experiment S082A (Extreme Ultraviolet Spectroheliograph), manually repositioning the filter wheel on experiment S054 (X-Ray Spectrographs Telescope), and retrieving experiment S149 impact detectors. The duration of the second extravehicular activity was 6 hours 54 minutes, and the duration of the third extravehicular activity was 3 hours 29 minutes.

The fourth and final extravehicular activity was performed on visit day 80. The major tasks accomplished consisted of retrieval of the Apollo Telescope Mount film, an additional performance of experiment S020, and performance of experiment T025. Other tasks consisted of retrieval of modules, panels, assemblies and samples that were to be returned to the ground for analysis, and deployment of cassettes and panels for potential retrieval in the future. The duration of the fourth extravehicular activity was 5 hours 19 minutes.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the third manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The third visit space vehicle was launched at 14:01:23 G.m.t. (9:01:23 a.m. e.s.t.) on November 16, 1973, from Launch Complex 39B at the Kennedy Space Center, Florida. The vehicle was manned by Lt. Col. Gerald P. Carr, Commander; Dr. Edward G. Gibson, Scientist Pilot; and Col. William R. Pogue, Pilot. The launch was originally scheduled for November 10, 1973; however, an inspection of the launch vehicle revealed cracks in the first stage fins and the decision to replace all of the fins necessitated the launch delay. The planned duration of the visit was 56 days with the option of extending it to a maximum of 84 days, which was achieved.

Orbital activities included four periods of extravehicular activity totaling approximately 22 1/4 hours. The first extravehicular activity was accomplished on visit day 7 and lasted 6 hours 34 minutes. The primary purpose of the activity — installation of film magazines in the Apollo Telescope Mount cameras — was accomplished satisfactorily. Other tasks accomplished included performing corrective maintenance on the experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) antenna, deploying panels of experiment D024 (Thermal Control Coatings), deploying impact detectors of experiment S149 (Particle Collection), deploying detector modules of experiment S228 (Trans-Uranic Cosmic Rays), and deploying collector assemblies of experiment S230 (Magnetospheric Particle Composition).

The second and third extravehicular activities were conducted on visit days 40 (Christmas Day) and 44 to allow extravehicular photography of the Comet Kohoutek prior to and after perihelion. The instruments for experiments S201 and T025 were used for this purpose. Experiment S020 (X-Ray/Ultraviolet Solar Photography) was also conducted on the second and third extravehicular activities. Other tasks performed during the visit day 40 extravehicular activity consisted of replacing film magazines in the Apollo Telescope Mount cameras, pinning open the door of experiment S082A (Extreme Ultraviolet Spectroheliograph), manually repositioning the filter wheel on experiment S054 (X-Ray Spectrographs Telescope), and retrieving experiment S149 impact detectors. The duration of the second extravehicular activity was 6 hours 54 minutes, and the duration of the third extravehicular activity was 3 hours 29 minutes.

The fourth and final extravehicular activity was performed on visit day 80. The major tasks accomplished consisted of retrieval of the Apollo Telescope Mount film, an additional performance of experiment S020, and performance of experiment T025. Other tasks consisted of retrieval of modules, panels, assemblies and samples that were to be returned to the ground for analysis, and deployment of cassettes and panels for potential retrieval in the future. The duration of the fourth extravehicular activity was 5 hours 19 minutes.

More books from Progressive Management

Cover of the book FEMA National Disaster Recovery Framework (NDRF) - Strengthening Disaster Recovery for the Nation - Core Recovery Principles, Guidance for Planning, Community Focus by Progressive Management
Cover of the book 2014 International Workshop on Research and Operational Considerations for Artificial Gravity Countermeasures: Mars Missions, Astronaut Performance, Long Duration Space Flight, Centrifugal Force by Progressive Management
Cover of the book The Air Force in Southeast Asia: Tactics and Techniques of Electronic Warfare - Electronic Countermeasures in the Air War Against North Vietnam 1965-1973 - Wild Weasel, Linebacker, B-52 by Progressive Management
Cover of the book Russian Political Warfare: Origin, Evolution, and Application - Comprehensive Study of Putin's Hybrid Warfare Campaigns Against United States and the West, Crimean Annexation, Ukraine, Gerasimov Model by Progressive Management
Cover of the book Ukraine Reports: The U.S. Military Commission to the Crimean War, 1855-1856 - History, Russia, European Armies by Progressive Management
Cover of the book Project Gemini Summary Conference: Comprehensive Overview of All Aspects of the Second American Manned Space Flight Program Leading to the Apollo Lunar Landing Missions - Operations, Missions, Science by Progressive Management
Cover of the book U.S. Naval Air Reserve History- Aviation Cadet Program, World War II, Props to Jets, Squantum, Grenada and Lebanon, Weekend Warriors by Progressive Management
Cover of the book NASA International Space Station (ISS) Human Spaceflight Program: Commercial Resupply Services Contracts for Cargo including SpaceX Dragon, Orbital ATK, and Sierra Nevada Dream Chaser Spacecraft by Progressive Management
Cover of the book 21st Century FEMA Study Course: Emergency Support Function #3 Public Works and Engineering (IS-803) - U.S. Army Corps of Engineers (USACE), ENGlink by Progressive Management
Cover of the book 2016 Perspectives on Nuclear Deterrence: USSTRATCOM Strategic Command Symposium - Enduring Value of Nuclear Weapons, Force Numbers Matter, Strong 21st Century Deterrent Need, China, Iran, North Korea by Progressive Management
Cover of the book The Role of Airpower in the Iran-Iraq War: Arab Air Warfare including Arab-Israeli War 1947, Suez 1956, Six-Day War 1967, October War 1973, Counterair, Support for Ground Forces, Command and Control by Progressive Management
Cover of the book Leveraging Social Networks to Enhance Innovation: Department of the Navy's ATHENA Project, TANG Initiative to Capture New Ideas from Sailors and Officers, Recommendations to Eliminate Barriers by Progressive Management
Cover of the book 21st Century FEMA Study Course: Emergency Support Function #4 Firefighting (IS-804) - NRF, Forest Service, Hotshot Crews, Wildland Fires, Structural Fires, National Interagency Fire Center (NIFC) by Progressive Management
Cover of the book National Space Weather Action Plan and Strategy: Potential Effects - Power Outages, Infrastructure, Communication, Mitigation Plans, Forecasting, Induced Geo-Electric Fields, Solar Radio Bursts (SRBs) by Progressive Management
Cover of the book The U.S. Air Force After Vietnam: Postwar Challenges and Potential for Responses - Vietnam in History, Interpreting Vietnam, Post-Vietnam Events and Public Discourse, Congress by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy