Project Management with Dynamic Scheduling

Baseline Scheduling, Risk Analysis and Project Control

Business & Finance, Management & Leadership, Operations Research, Planning & Forecasting
Cover of the book Project Management with Dynamic Scheduling by Mario Vanhoucke, Springer Berlin Heidelberg
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Mario Vanhoucke ISBN: 9783642404382
Publisher: Springer Berlin Heidelberg Publication: November 29, 2013
Imprint: Springer Language: English
Author: Mario Vanhoucke
ISBN: 9783642404382
Publisher: Springer Berlin Heidelberg
Publication: November 29, 2013
Imprint: Springer
Language: English

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on.

In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves.

The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on.

In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves.

The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".

More books from Springer Berlin Heidelberg

Cover of the book Simulation diskreter Prozesse by Mario Vanhoucke
Cover of the book Warum Ödipus keinen Ödipus-Komplex und Adonis keinen Schönheitswahn hatte by Mario Vanhoucke
Cover of the book Principles of Stellar Interferometry by Mario Vanhoucke
Cover of the book Why More Is Different by Mario Vanhoucke
Cover of the book Magnetic Resonance Imaging by Mario Vanhoucke
Cover of the book Data you need to know about China by Mario Vanhoucke
Cover of the book Nanozymes: Next Wave of Artificial Enzymes by Mario Vanhoucke
Cover of the book Porous Materials for Carbon Dioxide Capture by Mario Vanhoucke
Cover of the book Games Industry Management by Mario Vanhoucke
Cover of the book Ultrasonography of the Neck by Mario Vanhoucke
Cover of the book Digitalisierung in Bund, Ländern und Gemeinden by Mario Vanhoucke
Cover of the book Duplex and Color Doppler Imaging of the Venous System by Mario Vanhoucke
Cover of the book The History and Science of the Manhattan Project by Mario Vanhoucke
Cover of the book Intelligent Networked Teleoperation Control by Mario Vanhoucke
Cover of the book Bone and Joint Disease by Mario Vanhoucke
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy