End of an Era

Nonfiction, Art & Architecture, Architecture, History, General Art, Art History
Cover of the book End of an Era by Sparky Witte, AuthorHouse
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Sparky Witte ISBN: 9781491840221
Publisher: AuthorHouse Publication: January 9, 2014
Imprint: AuthorHouse Language: English
Author: Sparky Witte
ISBN: 9781491840221
Publisher: AuthorHouse
Publication: January 9, 2014
Imprint: AuthorHouse
Language: English

This is the true story of the History of the Demolition of the 2 Cooper River bridges . The Grace was complete in August,1929 and the Pearman was completed in 1966. They allowed traffic to flow between Charleston, South Carolina and Mount Pleasant, South Carolina. The Grace was built in 18 months, was a toll bridge and shortly after it was completed the country went into a deep depression. The Silas N. Pearman bridge was built to ease the high traffic demands that came with the growth of the area. It was a 3 lane bridge, where the Grace was 2 very narrow lanes. They were being replaced by a new higher span bridge named The Arthur Ravenel Bridge. A cable stay suspension bridge that is much higher for ships to travel underneath it better. The 2 Old Cooper River Bridge's we removed because they were rusting badly and obsolete. The contractor was Cashman/ Testa and they we responsible for the complete removal of all the steel and concrete above and below the water, up to 40 feet. Sparky Witte recorded the history of the removal for over 2 years. This is a coffee table book with the story and pictures of what took place during that time!

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This is the true story of the History of the Demolition of the 2 Cooper River bridges . The Grace was complete in August,1929 and the Pearman was completed in 1966. They allowed traffic to flow between Charleston, South Carolina and Mount Pleasant, South Carolina. The Grace was built in 18 months, was a toll bridge and shortly after it was completed the country went into a deep depression. The Silas N. Pearman bridge was built to ease the high traffic demands that came with the growth of the area. It was a 3 lane bridge, where the Grace was 2 very narrow lanes. They were being replaced by a new higher span bridge named The Arthur Ravenel Bridge. A cable stay suspension bridge that is much higher for ships to travel underneath it better. The 2 Old Cooper River Bridge's we removed because they were rusting badly and obsolete. The contractor was Cashman/ Testa and they we responsible for the complete removal of all the steel and concrete above and below the water, up to 40 feet. Sparky Witte recorded the history of the removal for over 2 years. This is a coffee table book with the story and pictures of what took place during that time!

More books from AuthorHouse

Cover of the book The Cross by Sparky Witte
Cover of the book Cancer Made Me Beautiful by Sparky Witte
Cover of the book The Right Direction by Sparky Witte
Cover of the book Journals of Regulatory Frame Work in Malawi by Sparky Witte
Cover of the book Full Circle by Sparky Witte
Cover of the book Gamble with the Sun by Sparky Witte
Cover of the book A Spiritual Diary by Sparky Witte
Cover of the book Eyes with Fury by Sparky Witte
Cover of the book Inspiritional Thoughts by Sparky Witte
Cover of the book Take over Control by Sparky Witte
Cover of the book Social Challenges Facing Cuba by Sparky Witte
Cover of the book You Should Have Been There by Sparky Witte
Cover of the book Fire and Ice by Sparky Witte
Cover of the book Cia Tiger Shadow Assassination Association by Sparky Witte
Cover of the book I Am . . . by Sparky Witte
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy