Apollo and America's Moon Landing Program: Apollo 13 Technical Crew Debriefing with Unique Observations about the Aborted Mission - Astronauts Lovell, Haise, and Swigert

Nonfiction, Science & Nature, Science, Physics, Astronomy, History, Americas
Cover of the book Apollo and America's Moon Landing Program: Apollo 13 Technical Crew Debriefing with Unique Observations about the Aborted Mission - Astronauts Lovell, Haise, and Swigert by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781465705099
Publisher: Progressive Management Publication: December 10, 2011
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781465705099
Publisher: Progressive Management
Publication: December 10, 2011
Imprint: Smashwords Edition
Language: English

This official NASA document - converted for accurate flowing-text ebook format reproduction - provides the complete transcription of the Apollo 13 post-flight debriefing given by astronauts Lovell, Haise, and Swigert, with their first-hand description of the harrowing flight. This ebook is an invaluable addition to the library of anyone interested in the Apollo moon landings.

Contents include: SUITING AND INGRESS * STATUS CHECKS AND COUNTDOWN * POWERED FLIGHT * EARTH ORBIT AND SYSTEMS CHECKOUT * TLI THROUGH S-IVB CLOSEOUT * TRANSLUNAR COAST * LUNAR MODULE FAMILIARIZATION * SPACECRAFT EMERGENCY * LUNAR FLYBY THROUGH 2-HOUR MANEUVER * TRANSEARTH COAST * ENTRY * LANDING AND RECOVERY * COMMAND AND SERVICE MODULE SYSTEMS OPERATIONS * LUNAR MODULE SYSTEMS OPERATIONS * FLIGHT DATA FILE * FLIGHT EQUIPMENT AND GOVERNMENT-FURNISHED EQUIPMENT * VISUAL SIGHTINGS * PREMISSION PLANNING * MISSION CONTROL * TRAINING * HUMAN FACTORS

Apollo 13 was supposed to land in the Fra Mauro area. An explosion on board forced Apollo 13 to circle the moon without landing. The Fra Mauro site was reassigned to Apollo 14.
At 5 1/2 minutes after liftoff, John Swigert, Fred Haise and James Lovell felt a little vibration. Then the center engine of the S-II stage shut down two minutes early. This caused the remaining four engines to burn 34 seconds longer than planned, and the S-IVB third stage had to burn nine seconds longer to put Apollo 13 in orbit.

Days before the mission, backup lunar module pilot, Charles Duke, inadvertently exposed the crew to German measles. Command Module Pilot Ken Mattingly had no immunity to measles and was replaced by backup command module pilot, John Swigert.

Ground tests before launch indicated the possibility of a poorly insulated supercritical helium tank in the lunar module, or LM, descent stage, so the flight plan was modified to enter the LM three hours early in order to obtain an onboard readout of helium tank pressure.

The No. 2 oxygen tank, serial number 10024X-TA0009, had been previously installed in the service module of Apollo 10, but was removed for modification and damaged in the process. The tank was fixed, tested at the factory, installed in the Apollo 13 service module and tested again during the Countdown Demonstration Test at NASA's Kennedy Space Center beginning March 16, 1970. The tanks normally are emptied to about half full. No. 1 behaved all right, but No. 2 dropped to only 92 percent of capacity. Gaseous oxygen at 80 pounds per square inch was applied through the vent line to expel the liquid oxygen, but to no avail. An interim discrepancy report was written, and on March 27, two weeks before launch, detanking operations resumed. No. 1 again emptied normally, but No. 2 did not. After a conference with contractor and NASA personnel, the test director decided to "boil off" the remaining oxygen in No. 2 by using the electrical heater within the tank. The technique worked, but it took eight hours of 65-volt DC power from the ground support equipment to dissipate the oxygen. Due to an oversight in replacing an underrated component during a design modification, this turned out to severely damage the internal heating elements of the tank.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This official NASA document - converted for accurate flowing-text ebook format reproduction - provides the complete transcription of the Apollo 13 post-flight debriefing given by astronauts Lovell, Haise, and Swigert, with their first-hand description of the harrowing flight. This ebook is an invaluable addition to the library of anyone interested in the Apollo moon landings.

Contents include: SUITING AND INGRESS * STATUS CHECKS AND COUNTDOWN * POWERED FLIGHT * EARTH ORBIT AND SYSTEMS CHECKOUT * TLI THROUGH S-IVB CLOSEOUT * TRANSLUNAR COAST * LUNAR MODULE FAMILIARIZATION * SPACECRAFT EMERGENCY * LUNAR FLYBY THROUGH 2-HOUR MANEUVER * TRANSEARTH COAST * ENTRY * LANDING AND RECOVERY * COMMAND AND SERVICE MODULE SYSTEMS OPERATIONS * LUNAR MODULE SYSTEMS OPERATIONS * FLIGHT DATA FILE * FLIGHT EQUIPMENT AND GOVERNMENT-FURNISHED EQUIPMENT * VISUAL SIGHTINGS * PREMISSION PLANNING * MISSION CONTROL * TRAINING * HUMAN FACTORS

Apollo 13 was supposed to land in the Fra Mauro area. An explosion on board forced Apollo 13 to circle the moon without landing. The Fra Mauro site was reassigned to Apollo 14.
At 5 1/2 minutes after liftoff, John Swigert, Fred Haise and James Lovell felt a little vibration. Then the center engine of the S-II stage shut down two minutes early. This caused the remaining four engines to burn 34 seconds longer than planned, and the S-IVB third stage had to burn nine seconds longer to put Apollo 13 in orbit.

Days before the mission, backup lunar module pilot, Charles Duke, inadvertently exposed the crew to German measles. Command Module Pilot Ken Mattingly had no immunity to measles and was replaced by backup command module pilot, John Swigert.

Ground tests before launch indicated the possibility of a poorly insulated supercritical helium tank in the lunar module, or LM, descent stage, so the flight plan was modified to enter the LM three hours early in order to obtain an onboard readout of helium tank pressure.

The No. 2 oxygen tank, serial number 10024X-TA0009, had been previously installed in the service module of Apollo 10, but was removed for modification and damaged in the process. The tank was fixed, tested at the factory, installed in the Apollo 13 service module and tested again during the Countdown Demonstration Test at NASA's Kennedy Space Center beginning March 16, 1970. The tanks normally are emptied to about half full. No. 1 behaved all right, but No. 2 dropped to only 92 percent of capacity. Gaseous oxygen at 80 pounds per square inch was applied through the vent line to expel the liquid oxygen, but to no avail. An interim discrepancy report was written, and on March 27, two weeks before launch, detanking operations resumed. No. 1 again emptied normally, but No. 2 did not. After a conference with contractor and NASA personnel, the test director decided to "boil off" the remaining oxygen in No. 2 by using the electrical heater within the tank. The technique worked, but it took eight hours of 65-volt DC power from the ground support equipment to dissipate the oxygen. Due to an oversight in replacing an underrated component during a design modification, this turned out to severely damage the internal heating elements of the tank.

More books from Progressive Management

Cover of the book 21st Century U.S. Military Manuals: Opposing Force OPFOR Worldwide Equipment Guide (WEG) Part 5 - Ground Systems - Antitank and Anti-armor including Russian, Chinese, U.S., North Korean by Progressive Management
Cover of the book 21st Century VA Independent Study Course: Visual Impairment and Blindness, Vision Loss, Eye Pathologies, Training Programs, Low Vision, Blind Rehabilitation, Psychological and Family Implications by Progressive Management
Cover of the book Eisenhower: The Leadership Development of Dwight D. Eisenhower and George S. Patton Jr., Military Education, Mentorship, Self-Development, Determination, Ike's Years with MacArthur, Patton in Combat by Progressive Management
Cover of the book "Lucky War" Third Army in Desert Storm: Complete History of Persian Gulf War, Planning a Ground Offensive, General Norman Schwarzkopf, Air Power, Command and Control, Iraq and Kuwait, Yeosock by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: National Guard Counterdrug Support - Authorized Missions, Use of Counterdrug Assets for Non-Counterdrug Missions, Arming of Troops and Use of Force by Progressive Management
Cover of the book Army Unmanned Aircraft System Operations (FMI 3-04.155) - Improved-Gnat (I-Gnat) (RQ-1L), Hunter (RQ-5/MQ-5), Shadow (RQ-7), Raven (RQ-11) - Joint Operations, Targeting, Reconnaissance by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Information Operations Field Manual - FM 100-6 by Progressive Management
Cover of the book A Kill is A Kill: Asymmetrically Attacking U.S. Airpower - Tactical and Operational Level, Targeting, On the Ramp, Aircraft Carriers, Deception, Urban Warfare, Israeli Experience, MANPADS, Lasers by Progressive Management
Cover of the book The President and the Intelligence Community: The Importance of the Relationship - Fascinating Case Studies of John Kennedy, George H.W. Bush, and George W. Bush, Including Bay of Pigs, Desert Storm by Progressive Management
Cover of the book Space Shuttle Columbia STS-107 Tragedy: Columbia Accident Investigation Board (CAIB) Transcripts of Board Public Hearings, In-Flight Rescue Options, Crew Survivability by Progressive Management
Cover of the book Jobbik: A Better Hungary at the Cost of Europe - Threat from Ultra-Nationalist Party, Effect on European Union, Anti-Semitism, Far Right Parties in Eastern Europe, Fascism, Irredentism, Populism by Progressive Management
Cover of the book Saturn IB Flight Manual (Skylab Saturn 1B Rocket) - Comprehensive Details of H-1 and J-2 Engines, S-IB and S-IVB Stages, Launch Facilities, Emergency Detection and Procedures by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Opposing Force OPFOR Worldwide Equipment Guide (WEG) Part 8 - Ground Systems - Logistics, Obscurants and Flame, Improvised Systems, Upgrades, Countermeasures by Progressive Management
Cover of the book Conquest from Within: A Comparative Analysis Between Soviet Active Measures and U.S. Unconventional Warfare Doctrine - Fascinating Review of Russian KGB Disinformation, Forgeries, and Propaganda by Progressive Management
Cover of the book Femme Fatale: Examination of the Role of Women in Combat and the Policy Implications for Future American Military Operations - World War II Female Fighters, Soviet Fliers, Islamic Terrorists, Shahida by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy