International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans

Nonfiction, Science & Nature, Science, Physics, Astrophysics & Space Science
Cover of the book International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781466070844
Publisher: Progressive Management Publication: March 2, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781466070844
Publisher: Progressive Management
Publication: March 2, 2012
Imprint: Smashwords Edition
Language: English

In 2010 the National Aeronautics and Space Administration (NASA) was authorized to extend the life of the International Space Station (ISS) from 2015 through at least September 30, 2020. Gauging the feasibility of doing so is quite complex. Among the factors to be assessed are the reliability of key components, NASA's ability to deliver spares to the ISS, the projected life of structures that cannot be replaced, and the health of systems that affect safety. While some empirical data exist, the ISS is a unique facility in space and assessing its extended life requires the use of sophisticated analytical techniques and judgments. GAO provided a preliminary report on NASA's use of such techniques in April 2011. For this review, GAO assessed the extent to which NASA has ensured essential spare parts are available and ISS structures and hardware are sound for continued ISS utilization through 2020. GAO interviewed NASA officials and outside experts; assessed the methodology underlying NASA's findings; conducted a limited test of data supporting NASA's assessments; and analyzed documentation such as ongoing assessments, schedules and other relevant efforts.

What GAO Found - NASA's approach to determining, obtaining, and delivering necessary spare parts to the ISS is reasonable to ensure continued utilization of the station through 2020. The statistical process and methodology being used to determine the expected lifetimes of replacement units is a sound and commonly accepted approach within the risk assessment community that considers both manufacturers' predictions and the systems' actual performance. To date NASA has given equal weight to manufacturers' predictions and actual performance, and currently has no plans to reassess this decision. However, as time goes on, the resulting estimates could prove to be overly conservative, given that NASA has found failure rates for replacement units to be lower than manufacturers' predictions. Therefore, continuing to weigh the manufacturers' predictions equally with actual performance could lead NASA to purchase an excess of spares. NASA also has a reasonable process for establishing performance goals for various functions necessary for utilization and determining whether available spares are sufficient to meet goals through 2020, but the rationale supporting these decisions has not been systematically documented.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

In 2010 the National Aeronautics and Space Administration (NASA) was authorized to extend the life of the International Space Station (ISS) from 2015 through at least September 30, 2020. Gauging the feasibility of doing so is quite complex. Among the factors to be assessed are the reliability of key components, NASA's ability to deliver spares to the ISS, the projected life of structures that cannot be replaced, and the health of systems that affect safety. While some empirical data exist, the ISS is a unique facility in space and assessing its extended life requires the use of sophisticated analytical techniques and judgments. GAO provided a preliminary report on NASA's use of such techniques in April 2011. For this review, GAO assessed the extent to which NASA has ensured essential spare parts are available and ISS structures and hardware are sound for continued ISS utilization through 2020. GAO interviewed NASA officials and outside experts; assessed the methodology underlying NASA's findings; conducted a limited test of data supporting NASA's assessments; and analyzed documentation such as ongoing assessments, schedules and other relevant efforts.

What GAO Found - NASA's approach to determining, obtaining, and delivering necessary spare parts to the ISS is reasonable to ensure continued utilization of the station through 2020. The statistical process and methodology being used to determine the expected lifetimes of replacement units is a sound and commonly accepted approach within the risk assessment community that considers both manufacturers' predictions and the systems' actual performance. To date NASA has given equal weight to manufacturers' predictions and actual performance, and currently has no plans to reassess this decision. However, as time goes on, the resulting estimates could prove to be overly conservative, given that NASA has found failure rates for replacement units to be lower than manufacturers' predictions. Therefore, continuing to weigh the manufacturers' predictions equally with actual performance could lead NASA to purchase an excess of spares. NASA also has a reasonable process for establishing performance goals for various functions necessary for utilization and determining whether available spares are sufficient to meet goals through 2020, but the rationale supporting these decisions has not been systematically documented.

More books from Progressive Management

Cover of the book Tribal Militias: An Effective Tool to Counter Al-Qaida and its Affiliates? The Iraqi Experience, Sahwa, Patron-Client Relationship, ISIS Onslaught, Yemen, Taking the Fight to al-Qaeda, Golden Swords by Progressive Management
Cover of the book 21st Century Essential Veterans Benefits Sourcebook: Complete Coverage of Education Benefits, the GI Bill, Home Loan Programs, Life Insurance Programs, Health Care - Including Dependents and Survivors by Progressive Management
Cover of the book U.S. Army War College Guide to National Security Issues, Volume I: Theory of War and Strategy - von Clausewitz, Mao, Sun Tzu, Che Guevara, Machiavelli, Luttwak - 5th Edition by Progressive Management
Cover of the book Encyclopedia of NASA Lessons Learned (Part 2): Thousands of Aerospace Technology Engineering Reports, Problems, Accidents, Mishaps, Ideas and Solutions - Space Shuttle, Spacecraft, Rockets, Aircraft by Progressive Management
Cover of the book Interagency Fratricide: Policy Failures in the Persian Gulf War and Bosnia Crisis - Rational Foreign Policy Decision Making Findings, National Security Council, Developing Endgame, Termination Policy by Progressive Management
Cover of the book 2017 Deterring a Nuclear-Arming North Korea: Kim Jong-un's Grand Strategy, China's North Korea Policy Challenge for Pacific Command, DPRK's Nuclear Weapons Technical Issues, Warheads, Plutonium by Progressive Management
Cover of the book 2014 President Barack Obama State of the Union Address plus 2013 and 2009 Inaugural Addresses and Presidential Campaign Speeches from 2012 by Progressive Management
Cover of the book Responding to Gangs: Evaluation and Research - Evolution of Street Gangs, Young Women in Street Gangs, Homicides, GREAT Program, State Legislation and Gang Prosecution Units by Progressive Management
Cover of the book Global Hawk Systems Engineering Case Study - UAV Drone Technical Information, Program History, Development and Production, Flight Testing - Unmanned Aerial System (UAS) by Progressive Management
Cover of the book 21st Century SOF: Toward an American Theory of Special Operations - Building and Sustaining a Special Operations Force by Progressive Management
Cover of the book 2011 Domestic Operational Law Handbook for Judge Advocates - WMD, CBRNE, Civil Disturbance, National Incident Management System (NIMS), Posse Comitatus, Special Events, Rules for Use of Forces by Progressive Management
Cover of the book Prelude to the Total Force: The Air National Guard 1943-1969 - ANG Forged in Politics, Struggle for Control, Integrating with the Active Force, Cold Warriors, Vindication, Berlin Airlift, Korean War by Progressive Management
Cover of the book 2011 After the Nuclear Meltdown: Crucial Survival and Medical Data for Nuclear Power Plant and Radiation Accidents and Terrorism - Essential Emergency Information for You and Your Family by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: U.S. Marine Corps (USMC) Military Police in Support of the MAGTF - Marine Corps Warfighting Publication (MCWP) 3-34.1 by Progressive Management
Cover of the book Directors of Central Intelligence (DCI) as Leaders of the U.S. Intelligence Community, 1946-2005, Central Intelligence Agency (CIA) Report - Dulles, Helms, Colby, Bush, Casey, Webster, Gates, Tenet by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy