International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans

Nonfiction, Science & Nature, Science, Physics, Astrophysics & Space Science
Cover of the book International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781466070844
Publisher: Progressive Management Publication: March 2, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781466070844
Publisher: Progressive Management
Publication: March 2, 2012
Imprint: Smashwords Edition
Language: English

In 2010 the National Aeronautics and Space Administration (NASA) was authorized to extend the life of the International Space Station (ISS) from 2015 through at least September 30, 2020. Gauging the feasibility of doing so is quite complex. Among the factors to be assessed are the reliability of key components, NASA's ability to deliver spares to the ISS, the projected life of structures that cannot be replaced, and the health of systems that affect safety. While some empirical data exist, the ISS is a unique facility in space and assessing its extended life requires the use of sophisticated analytical techniques and judgments. GAO provided a preliminary report on NASA's use of such techniques in April 2011. For this review, GAO assessed the extent to which NASA has ensured essential spare parts are available and ISS structures and hardware are sound for continued ISS utilization through 2020. GAO interviewed NASA officials and outside experts; assessed the methodology underlying NASA's findings; conducted a limited test of data supporting NASA's assessments; and analyzed documentation such as ongoing assessments, schedules and other relevant efforts.

What GAO Found - NASA's approach to determining, obtaining, and delivering necessary spare parts to the ISS is reasonable to ensure continued utilization of the station through 2020. The statistical process and methodology being used to determine the expected lifetimes of replacement units is a sound and commonly accepted approach within the risk assessment community that considers both manufacturers' predictions and the systems' actual performance. To date NASA has given equal weight to manufacturers' predictions and actual performance, and currently has no plans to reassess this decision. However, as time goes on, the resulting estimates could prove to be overly conservative, given that NASA has found failure rates for replacement units to be lower than manufacturers' predictions. Therefore, continuing to weigh the manufacturers' predictions equally with actual performance could lead NASA to purchase an excess of spares. NASA also has a reasonable process for establishing performance goals for various functions necessary for utilization and determining whether available spares are sufficient to meet goals through 2020, but the rationale supporting these decisions has not been systematically documented.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

In 2010 the National Aeronautics and Space Administration (NASA) was authorized to extend the life of the International Space Station (ISS) from 2015 through at least September 30, 2020. Gauging the feasibility of doing so is quite complex. Among the factors to be assessed are the reliability of key components, NASA's ability to deliver spares to the ISS, the projected life of structures that cannot be replaced, and the health of systems that affect safety. While some empirical data exist, the ISS is a unique facility in space and assessing its extended life requires the use of sophisticated analytical techniques and judgments. GAO provided a preliminary report on NASA's use of such techniques in April 2011. For this review, GAO assessed the extent to which NASA has ensured essential spare parts are available and ISS structures and hardware are sound for continued ISS utilization through 2020. GAO interviewed NASA officials and outside experts; assessed the methodology underlying NASA's findings; conducted a limited test of data supporting NASA's assessments; and analyzed documentation such as ongoing assessments, schedules and other relevant efforts.

What GAO Found - NASA's approach to determining, obtaining, and delivering necessary spare parts to the ISS is reasonable to ensure continued utilization of the station through 2020. The statistical process and methodology being used to determine the expected lifetimes of replacement units is a sound and commonly accepted approach within the risk assessment community that considers both manufacturers' predictions and the systems' actual performance. To date NASA has given equal weight to manufacturers' predictions and actual performance, and currently has no plans to reassess this decision. However, as time goes on, the resulting estimates could prove to be overly conservative, given that NASA has found failure rates for replacement units to be lower than manufacturers' predictions. Therefore, continuing to weigh the manufacturers' predictions equally with actual performance could lead NASA to purchase an excess of spares. NASA also has a reasonable process for establishing performance goals for various functions necessary for utilization and determining whether available spares are sufficient to meet goals through 2020, but the rationale supporting these decisions has not been systematically documented.

More books from Progressive Management

Cover of the book 21st Century FEMA Study Course: Introduction to Residential Coastal Construction (IS-386) - Beach Nourishment and Replenishment, Flood and Wind, Codes and Siting, Wildfires, Tsunami and Hurricane by Progressive Management
Cover of the book Disjointed Ways, Disunified Means: Learning From America's Struggle to Build an Afghan Nation - The Afghanistan War, Natural Resources and Drug Trade, al-Qaeda and Terrorism, Petraeus, McChrystal by Progressive Management
Cover of the book An Evaluation of the Human Domain Concept: Organizing the Knowledge, Influence, and Activity in Population-Centric Warfare – Military Innovation, Development in Sea, Air, Space, and Cyber Domains by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Air Force Aviation Management Instruction - Guidance for Administering Aircrew Flight Management Programs for Flying Unit Commanders and Aircrew Personnel by Progressive Management
Cover of the book Red Teaming: Past and Present - Case Studies: Field Marshal Slim in Burma, T.E. Lawrence in World War I, Operation Iraqi Freedom, Decision-Making Theory, Challenging Organization's Thinking by Progressive Management
Cover of the book 21st Century VA Independent Study Course: Endemic Infectious Diseases of Southwest Asia - Afghanistan and Iraq - Diagnosis and Treatment (Veterans Health Issues Series) by Progressive Management
Cover of the book Loss of Signal: Aeromedical Lessons Learned from the STS-107 Columbia Space Shuttle Mishap - Aerospace Medicine, Reentry and Spacecraft Breakup, Search and Recovery, Forensic Sciences by Progressive Management
Cover of the book China and North Korea: A Peculiar Relationship - Cheonan, Significance as Buffer State, Nuclear Brinksmanship, Potential for Collapse and Mass Migration, Reunification, China's Coercive Capability by Progressive Management
Cover of the book History of the South Atlantic Division (SAD) U.S. Army Corps of Engineers, 1945-2011 - Tenn-Tom, Panama Canal, Space Race, NASA Kennedy Space Center, Cape Canaveral, Hurricane Damage, Desert Shield by Progressive Management
Cover of the book Commander's Handbook for Joint Time-Sensitive Targeting: United States Joint Forces Command, Engaging Targets, Intelligence, Decision Cycles, Major Theater of War and Small-scale Contingencies by Progressive Management
Cover of the book Mars Wars: The Rise and Fall of the Space Exploration Initiative - President George H. W. Bush, Quayle, Truly, NASA's 90-Day Study, Washington Space Policy Power Struggle over the Moon - Mars Program by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Opposing Force OPFOR Worldwide Equipment Guide (WEG) Part 10 - Airspace and Air Defense Systems, UAVs, Unmanned Aerial Vehicles, Theater Missiles, Air Defense by Progressive Management
Cover of the book The Future of Command and Control: Complexity, Networking, and Effects-Based Approaches to Operations - Terrorism, the Post 9-11 World, von Moltke, Clausewitz, Decisionmaking during Apollo 13 by Progressive Management
Cover of the book An Examination of Intercontinental Ballistic Missile (ICBM) Development Within the United States from 1952 to 1965 - Missile Gap, Sputnik, General Bernard Schriever, Simon Ramo by Progressive Management
Cover of the book Measuring the Immeasurable: An Approach to Assessing the Effectiveness of Engineering Civic Assistance Projects Towards Achieving National Security Objectives - Humanitarian Efforts by World Vision by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy