Complete Guide to Weather Satellites: NOAA Polar and Geostationary Satellites, GOES, POES, JPSS, DMSP, Potential Critical Gaps in Data, Program History, Military and Earth Observation, Forecasting

Nonfiction, Science & Nature, Science, Other Sciences, Meteorology, Technology, Aeronautics & Astronautics
Cover of the book Complete Guide to Weather Satellites: NOAA Polar and Geostationary Satellites, GOES, POES, JPSS, DMSP, Potential Critical Gaps in Data, Program History, Military and Earth Observation, Forecasting by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781310389382
Publisher: Progressive Management Publication: January 16, 2016
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781310389382
Publisher: Progressive Management
Publication: January 16, 2016
Imprint: Smashwords Edition
Language: English

Professionally converted for accurate flowing-text e-book format reproduction, this unique collection of government documents provides comprehensive coverage of all aspects of current and planned American weather satellites, with material from NOAA, NASA, and independent reviews of the troubled replacement program.

Contents: Launch Delayed - NOAA Faces Key Decisions on Timing of Future Satellites * Improvements Needed in NOAA's Mitigation Strategies as It Prepares for Potential Satellite Coverage Gaps * Polar Weather Satellites - NOAA Needs To Prepare for Near-term Data Gaps * Geostationary Weather Satellites - Launch Date Nears, but Remaining Schedule Risks Need to be Addressed * History of the NOAA Satellite Program * NOAA Satellite Conference 2015 Summary Report * NOAA-N Satellite, POES Program * NOAA Response - A Review of NOAA's Satellite Program: A Way Forward * NOAA's GOES R - Next Generation Satellite * NOAA Knows...Earth-Observing Satellites * Options for Modernizing Military Weather Satellites * Bridging the Gap: America's Weather Satellites and Weather Forecasting

The National Oceanic and Atmospheric Administration's (NOAA) $10.9 billion Geostationary Operational Environmental Satellite-R (GOES-R) program recently delayed the planned launch of the first satellite in the new series from March 2016 to October 2016. Based on its ongoing work, GAO found that the decision to delay the launch was due to poor schedule performance over the last few years (losing more than 10 days a month on average), recent technical issues with key components, and little schedule margin as the program entered integration testing. The October 2016 launch date may also be delayed if additional technical challenges arise or if schedule performance remains poor.

NOAA recently changed assumptions about the expected lifespan of existing GOES satellites from 7 to 10 years based on the longevity of prior satellites. However, the analysis supporting this change is over 10 years old. Even with this extension, NOAA may fall short of its policy of having 2 operational satellites and 1 backup satellite in orbit. The agency faces an 11 month gap in backup coverage until GOES-R is operational, during which time there would be only 2 operational satellites. Any further delays in the GOES-R launch date could exacerbate that gap. NOAA is now facing important decisions on when to launch the remaining satellites in the GOES-R series to maximize satellite coverage while minimizing development and storage costs.

Based on its ongoing work, GAO found that NOAA's $11.3 billion Joint Polar Satellite System (JPSS) program is making progress toward the planned launch of the JPSS-1 satellite in March 2017. However, the program has experienced technical issues that have affected internal schedule deadlines, such as an issue with debris in an instrument's subsystem that delayed its delivery by approximately 8 months, and faces key risks in the remainder of development. NOAA is also facing the risk of a potential near-term gap in polar data prior to the launch of the JPSS-1 satellite. Similar to the decision on the GOES satellites, in April 2015, NOAA revised its assumptions about the expected life of the satellite that is currently in-orbit by adding up to 4 years, which would reduce the chance of a near-term gap. However, risks to the performance and health of the on-orbit satellite, and to development of the JPSS-2 satellite could increase the risk of a gap. Also, NOAA faces key decisions on timing the development and launch of the remaining JPSS satellites to ensure satellite continuity while balancing the possibility that satellites could last much longer than anticipated.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

Professionally converted for accurate flowing-text e-book format reproduction, this unique collection of government documents provides comprehensive coverage of all aspects of current and planned American weather satellites, with material from NOAA, NASA, and independent reviews of the troubled replacement program.

Contents: Launch Delayed - NOAA Faces Key Decisions on Timing of Future Satellites * Improvements Needed in NOAA's Mitigation Strategies as It Prepares for Potential Satellite Coverage Gaps * Polar Weather Satellites - NOAA Needs To Prepare for Near-term Data Gaps * Geostationary Weather Satellites - Launch Date Nears, but Remaining Schedule Risks Need to be Addressed * History of the NOAA Satellite Program * NOAA Satellite Conference 2015 Summary Report * NOAA-N Satellite, POES Program * NOAA Response - A Review of NOAA's Satellite Program: A Way Forward * NOAA's GOES R - Next Generation Satellite * NOAA Knows...Earth-Observing Satellites * Options for Modernizing Military Weather Satellites * Bridging the Gap: America's Weather Satellites and Weather Forecasting

The National Oceanic and Atmospheric Administration's (NOAA) $10.9 billion Geostationary Operational Environmental Satellite-R (GOES-R) program recently delayed the planned launch of the first satellite in the new series from March 2016 to October 2016. Based on its ongoing work, GAO found that the decision to delay the launch was due to poor schedule performance over the last few years (losing more than 10 days a month on average), recent technical issues with key components, and little schedule margin as the program entered integration testing. The October 2016 launch date may also be delayed if additional technical challenges arise or if schedule performance remains poor.

NOAA recently changed assumptions about the expected lifespan of existing GOES satellites from 7 to 10 years based on the longevity of prior satellites. However, the analysis supporting this change is over 10 years old. Even with this extension, NOAA may fall short of its policy of having 2 operational satellites and 1 backup satellite in orbit. The agency faces an 11 month gap in backup coverage until GOES-R is operational, during which time there would be only 2 operational satellites. Any further delays in the GOES-R launch date could exacerbate that gap. NOAA is now facing important decisions on when to launch the remaining satellites in the GOES-R series to maximize satellite coverage while minimizing development and storage costs.

Based on its ongoing work, GAO found that NOAA's $11.3 billion Joint Polar Satellite System (JPSS) program is making progress toward the planned launch of the JPSS-1 satellite in March 2017. However, the program has experienced technical issues that have affected internal schedule deadlines, such as an issue with debris in an instrument's subsystem that delayed its delivery by approximately 8 months, and faces key risks in the remainder of development. NOAA is also facing the risk of a potential near-term gap in polar data prior to the launch of the JPSS-1 satellite. Similar to the decision on the GOES satellites, in April 2015, NOAA revised its assumptions about the expected life of the satellite that is currently in-orbit by adding up to 4 years, which would reduce the chance of a near-term gap. However, risks to the performance and health of the on-orbit satellite, and to development of the JPSS-2 satellite could increase the risk of a gap. Also, NOAA faces key decisions on timing the development and launch of the remaining JPSS satellites to ensure satellite continuity while balancing the possibility that satellites could last much longer than anticipated.

More books from Progressive Management

Cover of the book China's Largesse: Why China is Generous With Foreign Aid - History of Communist China's Foreign Policy in Cambodia and Kenya, Pursuit of Sovereignty in the South China Sea, Threat to U.S. Interest by Progressive Management
Cover of the book The Revolutionary War (War of American Independence): The Virginia Campaign and the Blockade and Siege of Yorktown, French Participation in the American Revolution by Progressive Management
Cover of the book 21st Century Textbooks of Military Medicine - Military Preventive Medicine: Mobilization and Deployment, Volume 1 - Diseases and Conditions from Jet Lag to WMDs and NBC (Emergency War Surgery Series) by Progressive Management
Cover of the book 21st Century Military Documents: Commander's Guide to Regulated Medical Waste (RMW) Management - Treatment, Transportation, Segregation, Packaging, Storage, Sharps, Blood, Biosafety Levels by Progressive Management
Cover of the book Soldiers of Misfortune? Blackwater USA, Private Military Security Contractors (PMSCs), Iraq War, Afghanistan War, Counterinsurgency (COIN) Campaigns, DynCorp, Zapata, Kroll by Progressive Management
Cover of the book A Kill is A Kill: Asymmetrically Attacking U.S. Airpower - Tactical and Operational Level, Targeting, On the Ramp, Aircraft Carriers, Deception, Urban Warfare, Israeli Experience, MANPADS, Lasers by Progressive Management
Cover of the book Air-to-Ground Battle for Italy: A World War II Memoir by a P-40 and P-47 Fighter Pilot - Fears, Uncertainties, and Accomplishments of Ordinary Americans at War by Progressive Management
Cover of the book Saturn IB Flight Manual (Skylab Saturn 1B Rocket) - Comprehensive Details of H-1 and J-2 Engines, S-IB and S-IVB Stages, Launch Facilities, Emergency Detection and Procedures by Progressive Management
Cover of the book Red Is Good: Transformational Changes for U.S. Air Force Aircraft Maintenance - Culture Change and Transformation, Metrics, Goal Setting, Toyota Production System, Enterprise Level by Progressive Management
Cover of the book The First 109 Minutes: 9/11 Attacks and the U.S. Air Force (USAF) - NORAD, The Four Terror Flights, Air Defense Response, Post-Attack, plus Combating Terrorism Technical Support Office Review Book by Progressive Management
Cover of the book The Shenandoah Valley Campaign: March -November 1864: Grant, Lincoln, Sheridan, Meade, Monocacy, Baltimore and Ohio Railroad, Cedar Creek, Lt. General Jubal A. Early, McCausland by Progressive Management
Cover of the book The Report of the Presidential Commission on the Space Shuttle Challenger Accident: The Tragedy of Mission 51-L in 1986 - Volume Two, Appendix E, F, G, H, I, J, and K, including Feynman Analysis by Progressive Management
Cover of the book Don't Forget About Dedicated Sea Mine Countermeasures (MCM) - Scenario for Disaster, History, Current Force, Threat to American Economic Security, Shipping Lane Protection, Straits of Malacca, Hormuz by Progressive Management
Cover of the book Weather Satellite Programs at Risk: Problems with America's Polar and Geostationary Environmental Satellites, JPSS and GOES, Possible Gaps in Critical Data for Weather Forecasting Models by Progressive Management
Cover of the book 2012 Unmanned Aircraft Systems (UAS) Research, Development and Demonstration Roadmap of the Next Generation Air Transportation System - Domestic UAV and Drone Operations by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy