Central Utah Project (CUP): Bonneville Unit - Historic Reclamation Projects Book - Water Projects, Flood Control, Starvation Dam, Reservoirs, Aqueducts, Tunnels, Canals, Power Plants

Nonfiction, Science & Nature, Technology, Engineering, Civil
Cover of the book Central Utah Project (CUP): Bonneville Unit - Historic Reclamation Projects Book - Water Projects, Flood Control, Starvation Dam, Reservoirs, Aqueducts, Tunnels, Canals, Power Plants by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781310197529
Publisher: Progressive Management Publication: September 26, 2014
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781310197529
Publisher: Progressive Management
Publication: September 26, 2014
Imprint: Smashwords Edition
Language: English

The Central Utah Project (CUP) is a massive and complicated water development project. It is the largest in the State of Utah. The ultimate plans for the CUP were among the largest and most complex contemplated by the Bureau of Reclamation. To make the project more manageable, Reclamation broke the initial phase of the CUP into four independent projects which could be united by the ultimate phase. Of the four units authorized by Congress as the initial phase, the largest and most complex is the Bonneville Unit, which itself is broken into interconnected parts. Reclamation's plans called for ten new reservoirs; enlargement of two existing reservoirs; 140 miles of aqueducts, tunnels, and canals; three power plants; nine pumping stations; and 200 miles of pipe drains. Because of its size and complexity, it is the Bonneville Unit that people most frequently associate with the CUP, sometimes to the exclusion of the Vernal and Jensen Units, which have been constructed to benefit communities in the Uinta Basin.

The history of the CUP is as large and complex as the project itself. And as with the project, the popular notion is that the history of the Bonneville Unit is the history of the CUP. There is some validity in this assumption. Certainly the history of the other units of the CUP, particularly those that were not built, includes colorful stories of the struggles to push forward a vision—engineering challenges, political intrigue, battles with opponents, courtroom drama, and the like. But the history of the CUP is filled with all of these. The history of the CUP is a microcosm of the large history of the battles over the Colorado River, wrapped with a thick layer of its own unique history.

Project Location * Historical Setting * Project Authorization * Construction History * Starvation Complex * Starvation Dam * Knight Diversion Dam * Starvation Feeder Conduit * Bottle Hollow * Strawberry Aqueduct and Collection System * Water Hollow Tunnel - Channel Number 2 * Soldier Creek Dam * Layout and Currant Tunnels * Jordan Aqueduct Reach I and II * Currant Creek Dam * Vat Tunnel * Stillwater Tunnel * "Hit List" * West Fork Pipeline- Vat Diversion Dam and 404 permits * Hades and Rhodes Tunnels * Supplemental Repayment Contract Jordan Aqueduct-Reach III and IV-TPA Lawsuit * Upper Stillwater Dam * North Fork Siphon * Doc's, Hades, Win, and Rhodes Diversions and Feeder Pipelines * Jordanelle Dam * Diamond Fork Power System - Syar Tunnel and Sixth Water Flow Control Structure * CUP Completion Act * Post Construction History * Bonneville Irrigation and Drainage System - Utah Lake System * Diamond Fork System * Settlement of Project Lands * Uses of Project Water * Conclusion

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

The Central Utah Project (CUP) is a massive and complicated water development project. It is the largest in the State of Utah. The ultimate plans for the CUP were among the largest and most complex contemplated by the Bureau of Reclamation. To make the project more manageable, Reclamation broke the initial phase of the CUP into four independent projects which could be united by the ultimate phase. Of the four units authorized by Congress as the initial phase, the largest and most complex is the Bonneville Unit, which itself is broken into interconnected parts. Reclamation's plans called for ten new reservoirs; enlargement of two existing reservoirs; 140 miles of aqueducts, tunnels, and canals; three power plants; nine pumping stations; and 200 miles of pipe drains. Because of its size and complexity, it is the Bonneville Unit that people most frequently associate with the CUP, sometimes to the exclusion of the Vernal and Jensen Units, which have been constructed to benefit communities in the Uinta Basin.

The history of the CUP is as large and complex as the project itself. And as with the project, the popular notion is that the history of the Bonneville Unit is the history of the CUP. There is some validity in this assumption. Certainly the history of the other units of the CUP, particularly those that were not built, includes colorful stories of the struggles to push forward a vision—engineering challenges, political intrigue, battles with opponents, courtroom drama, and the like. But the history of the CUP is filled with all of these. The history of the CUP is a microcosm of the large history of the battles over the Colorado River, wrapped with a thick layer of its own unique history.

Project Location * Historical Setting * Project Authorization * Construction History * Starvation Complex * Starvation Dam * Knight Diversion Dam * Starvation Feeder Conduit * Bottle Hollow * Strawberry Aqueduct and Collection System * Water Hollow Tunnel - Channel Number 2 * Soldier Creek Dam * Layout and Currant Tunnels * Jordan Aqueduct Reach I and II * Currant Creek Dam * Vat Tunnel * Stillwater Tunnel * "Hit List" * West Fork Pipeline- Vat Diversion Dam and 404 permits * Hades and Rhodes Tunnels * Supplemental Repayment Contract Jordan Aqueduct-Reach III and IV-TPA Lawsuit * Upper Stillwater Dam * North Fork Siphon * Doc's, Hades, Win, and Rhodes Diversions and Feeder Pipelines * Jordanelle Dam * Diamond Fork Power System - Syar Tunnel and Sixth Water Flow Control Structure * CUP Completion Act * Post Construction History * Bonneville Irrigation and Drainage System - Utah Lake System * Diamond Fork System * Settlement of Project Lands * Uses of Project Water * Conclusion

More books from Progressive Management

Cover of the book A History of Marine Fighter Attack Squadron 323: U.S. Marine Corps History, World War II, Pacific Warfare, Combat Action in the Korean War, Intensive Involvement in Vietnam War by Progressive Management
Cover of the book Oil for the Lamps of China: Beijing's 21st-Century Search for Energy: Coal, Oil, Natural Gas, Power Distribution System, Environment, Defense, Nuclear, Renewable, Solar, Wind, Geothermal by Progressive Management
Cover of the book Sowing the Seeds of Soft Power: The United States and India in the Next Great Game - Eurasia, Indian Domestic Values and Culture, Hollywood to Bollywood, Fight Against Terrorism, Nuclear Weapons by Progressive Management
Cover of the book Naval Aviation Vision: Sea Control, Maritime Security, Power Projection, Deterrence, Humanitarian Assistance, Century of Excellence, Future, Transformation Roadmaps, Forcenet by Progressive Management
Cover of the book 2015 U.S. Air Force Future Plans: Nuclear Global Strike Command Strategic Master Plan, Intelligence, Surveillance, and Reconnaissance (ISR) 2023 Strategic Vision, Global Horizons, Cyber Command Vision by Progressive Management
Cover of the book Responsibility of Command: How UN and NATO Commanders Influenced Airpower over Bosnia - History of the Bosnia War, Operation Deny Flight, Srebrenica by Progressive Management
Cover of the book 21st Century Understanding Cancer Toolkit: Cancer Clusters, Carcinogenesis, Cancer and the Environment, Studies of Suspected Clusters, Interaction of Environmental Factors and Genes by Progressive Management
Cover of the book 21st Century Essential Guide to NIF: National Ignition Facility - Laser Inertial Confinement Nuclear Fusion for Energy Research and National Security, LIFE Power Concept by Progressive Management
Cover of the book Hearts and Minds: The Political and Military Effectiveness of the Rhode Island Militia in the American Revolution - War of Independence, Revolutionary War, Indian Threats, Colonial Wars, Gaspee by Progressive Management
Cover of the book Analytic Culture in the U.S. Intelligence Community: An Ethnographic Study - Working as an Intelligence Analyst, Central Intelligence Agency (CIA) Intelligence Papers by Progressive Management
Cover of the book Apollo and America's Moon Landing Program: Apollo 12 Technical Crew Debriefing with Unique Observations about the Second Lunar Landing - Astronauts Conrad, Gordon, Bean by Progressive Management
Cover of the book Air Force Roles and Missions: A History - Origins, Transitions, World War II and Dawn of Global Air Power, Unification, Massive Retaliation, Vietnam War and Flexible Response, Maturing of Roles by Progressive Management
Cover of the book Going to Extremes: Climate Change and the Increasing Risk of Weather Disasters by Progressive Management
Cover of the book Preparing for the Future: Developing an Adaptive Army in a Time of Peace, 1918-1941 - Between World War I and II, Fort Leavenworth Instruction, Large-Scale Maneuvers and Protective Mobilization Plan by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Weather for Aircrews - Air Force Handbook 11-203, Fundamentals of Weather, Text for Flight Training Programs, Air Masses, Aircraft Icing, Ceilings, Storms by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy