Space Shuttle NASA Mission Reports: 1983 and 1984 Missions, STS-7, STS-8, STS-9, STS 41-B, STS 41-C, STS-41-D, STS 41-G, STS 51-A

Nonfiction, Science & Nature, Science, Physics, Astronomy, History, Americas
Cover of the book Space Shuttle NASA Mission Reports: 1983 and 1984 Missions, STS-7, STS-8, STS-9, STS 41-B, STS 41-C, STS-41-D, STS 41-G, STS 51-A by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781465736277
Publisher: Progressive Management Publication: December 22, 2011
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781465736277
Publisher: Progressive Management
Publication: December 22, 2011
Imprint: Smashwords Edition
Language: English

These official final orbiter mission reports issued by the NASA Johnson Space Center cover missions in 1982 and 1983: STS-7, STS-8, STS-9, STS 41-B, STS 41-C, STS-41-D, STS 41-G, STS 51-A. In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS-7: The STS-7 flight was launched on June 18, 1983 and landed at Edwards AFB, CA. The crew for this flight, the largest number ever flown, were Captain R. L. Crippen, Commander; Captain F. H. Hauck, Pilot; and Colonel J. M. Fabian and S. K. Ride, PhD., Mission Specialists; and N. E. Thagard, M.D., Medical Specialist.

STS-8: The STS-8 flight was launched on August 30, 1983 and landed at Edwards on September 6. STS-8 provided the first night launch and landing of the Program. The crew for this fourth operational flight was Capt. R. H. Truly, Commander; Cdr. D. C. Brandenstein, Pilot; Lt. Col. G. S. Bluford, and Lt. Cdr. D. A. Gardner, Mission Specialists; and W. E. Thornton, M.D., Medical Specialist.

STS-9: The STS-9 flight, the first flight of the European-Space-Agency built Spacelab, was launched on November 28, 198 and landed at Edwards on December 8, 1983. This flight was launched on the most northern inclination (57 deg.) of any U.S. manned flight. The 6-man crew for this Spacelab mission, the largest crew ever flown, was composed of four astronauts and two non-astronaut payload specialists, one of whom was the first foreign person to be launched by the U.S.

STS 41-B: The STS-41B flight was launched from Launch Complex 39 and landed at the KSC SLF on February 11, 1984. This flight ended with the completion of one of the last major test objectives of the program, that of landing at the Kennedy Space Center.

STS 41-C: The STS 41-C flight was launched on April 6, 1984 and landed at Edwards on April 13, 1984. This flight was scheduled as a 6-day mission, but SMM retrieval problems during flight day 3 operations resulted in extending the mission 1 day for a total of 7 days. Also, this flight was scheduled to land at the Kennedy Space Center Shuttle Landing Facility; however, the possibility of adverse weather (rain) resulted in a decision to land at Edwards AFB, California.

STS-41-D: The STS 41-D mission, the first for the OV-103 vehicle, Discovery, was scheduled for launch on June 25, 1984, and June 26, 1984, and August 29, 1984. The attempted launch on June 25, 1984, was scrubbed because GPC-5 (general purpose computer-5), which contained the backup flight system software, exhibited two memory parity errors at T-32 minutes.

STS 41-G: The STS 41-G mission, the sixth flight for the OV-099 vehicle, Challenger, was launched from Launch Complex 39A on October 5, 1984. In the areas of payloads and experiments, all except the SIR (Shuttle Imaging Radar) accomplished essentially all of their objectives. The crew for this flight were Robert L. Crippen, Captain, USN, Commander; Jon A. McBride, Commander, USN, Pilot; Sally K. Ride, PhD., Kathryn D. Sullivan, PhD., and David C. Leetsma, Lt. Cdr., USN, Mission Specialists; Paul D. Scully-Power, PhD., Payload Specialist; and Marc Garneau, PhD., Canadian Payload Specialist.

STS 51-A: The STS 51-A mission was scheduled for launch on November 7, 1984, but the launch was scrubbed during the planned hold at T-20 minutes because the data indicated that the predicted winds-aloft would apply shear loads in excess of the design limits of the vehicle. The final countdown culminated in a successful launch from launch complex 39A on November 8, 1984, and the mission was completed with a landing at the KSC SLF on November 16, 1984.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

These official final orbiter mission reports issued by the NASA Johnson Space Center cover missions in 1982 and 1983: STS-7, STS-8, STS-9, STS 41-B, STS 41-C, STS-41-D, STS 41-G, STS 51-A. In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS-7: The STS-7 flight was launched on June 18, 1983 and landed at Edwards AFB, CA. The crew for this flight, the largest number ever flown, were Captain R. L. Crippen, Commander; Captain F. H. Hauck, Pilot; and Colonel J. M. Fabian and S. K. Ride, PhD., Mission Specialists; and N. E. Thagard, M.D., Medical Specialist.

STS-8: The STS-8 flight was launched on August 30, 1983 and landed at Edwards on September 6. STS-8 provided the first night launch and landing of the Program. The crew for this fourth operational flight was Capt. R. H. Truly, Commander; Cdr. D. C. Brandenstein, Pilot; Lt. Col. G. S. Bluford, and Lt. Cdr. D. A. Gardner, Mission Specialists; and W. E. Thornton, M.D., Medical Specialist.

STS-9: The STS-9 flight, the first flight of the European-Space-Agency built Spacelab, was launched on November 28, 198 and landed at Edwards on December 8, 1983. This flight was launched on the most northern inclination (57 deg.) of any U.S. manned flight. The 6-man crew for this Spacelab mission, the largest crew ever flown, was composed of four astronauts and two non-astronaut payload specialists, one of whom was the first foreign person to be launched by the U.S.

STS 41-B: The STS-41B flight was launched from Launch Complex 39 and landed at the KSC SLF on February 11, 1984. This flight ended with the completion of one of the last major test objectives of the program, that of landing at the Kennedy Space Center.

STS 41-C: The STS 41-C flight was launched on April 6, 1984 and landed at Edwards on April 13, 1984. This flight was scheduled as a 6-day mission, but SMM retrieval problems during flight day 3 operations resulted in extending the mission 1 day for a total of 7 days. Also, this flight was scheduled to land at the Kennedy Space Center Shuttle Landing Facility; however, the possibility of adverse weather (rain) resulted in a decision to land at Edwards AFB, California.

STS-41-D: The STS 41-D mission, the first for the OV-103 vehicle, Discovery, was scheduled for launch on June 25, 1984, and June 26, 1984, and August 29, 1984. The attempted launch on June 25, 1984, was scrubbed because GPC-5 (general purpose computer-5), which contained the backup flight system software, exhibited two memory parity errors at T-32 minutes.

STS 41-G: The STS 41-G mission, the sixth flight for the OV-099 vehicle, Challenger, was launched from Launch Complex 39A on October 5, 1984. In the areas of payloads and experiments, all except the SIR (Shuttle Imaging Radar) accomplished essentially all of their objectives. The crew for this flight were Robert L. Crippen, Captain, USN, Commander; Jon A. McBride, Commander, USN, Pilot; Sally K. Ride, PhD., Kathryn D. Sullivan, PhD., and David C. Leetsma, Lt. Cdr., USN, Mission Specialists; Paul D. Scully-Power, PhD., Payload Specialist; and Marc Garneau, PhD., Canadian Payload Specialist.

STS 51-A: The STS 51-A mission was scheduled for launch on November 7, 1984, but the launch was scrubbed during the planned hold at T-20 minutes because the data indicated that the predicted winds-aloft would apply shear loads in excess of the design limits of the vehicle. The final countdown culminated in a successful launch from launch complex 39A on November 8, 1984, and the mission was completed with a landing at the KSC SLF on November 16, 1984.

More books from Progressive Management

Cover of the book 21st Century U.S. Military Manuals: U.S. Marine Corps (USMC) Intelligence Operations MCWP 2-1 (Value-Added Professional Format Series) by Progressive Management
Cover of the book Overt Indicators of Islamic Extremism in Nigeria: Muslim Tradition, Possible Safe Haven for Terrorism, al-Qaeda Forces and Relationships, Dawa, Jihad, Madrassas, Sharia Law, Sunni and Salafi by Progressive Management
Cover of the book 21st Century FEMA Study Course: National Incident Management System (Incident Command System) Emergency Responder Field Operations Guide by Progressive Management
Cover of the book The United States Army in Afghanistan: Operation Enduring Freedom, March 2002 - April 2005 - Creating the Afghan National Army, Taliban, al Qaeda, President Karzai by Progressive Management
Cover of the book U.S. Navy Aircraft Carriers: Carrier Battle Groups, Airplanes, Flight Operations, History and Evolution from Escort Carriers to Nuclear-powered Supercarriers by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Air Force C-5 Galaxy Military Transport Aircraft - Operations Procedures, Aircrew Evaluation Criteria, Aircrew Training Flying Operations by Progressive Management
Cover of the book The South China Sea (SCS) Territorial Disputes: Catalyst for a United States - Vietnamese Security Partnership - Strategy, Policy, Provocations and Challenges, Role of Philippines, Malaysia, Brunei by Progressive Management
Cover of the book 21st Century U.S. Military Documents: The Air Force in Southeast Asia: The Air Force in Vietnam - The Administration Emphasizes Air Power, 1969 - Nixon, Vietnamization, VNAF Modernization by Progressive Management
Cover of the book Complete Guide to the 1993 Waco Compound Standoff and Tragedy - Branch Davidians, David Koresh (Vernon Howell), Followers - ATF, FBI, Clinton Justice Dept., Janet Reno, Danforth and Treasury Reports by Progressive Management
Cover of the book Navy Shipboard Lasers for Surface, Air, and Missile Defense: Deployment of the First Solid-State Laser Directed Energy Weapon, SSL, FEL, TLS, MLD, Terminal Defense Against China's ASBM by Progressive Management
Cover of the book Civilization's Drying Cradle: Water Politics in the Tigris-Euphrates River Basin - Water Supplies and Conflicts, Desalination, Dams, Hydroelectric Plants, Drought Impacting Turkey, Syria, Iraq by Progressive Management
Cover of the book Complete Guide to the U.S. Africa Command (USAFRICOM, AFRICOM) - The Fight Against Terrorism, al-Qaida, Strategic Interests, Contingency Operations, ACOTA, Kony and LRA by Progressive Management
Cover of the book 21st Century FEMA Study Course: Emergency Support Function #2 Communications (IS-802) - FCC, Cyber Incidents, NCRCG Coordination Group by Progressive Management
Cover of the book Army Modernization Plans, Army Equipping Strategy, Tactical Wheeled Vehicle (TWV) Strategy, Affordable and Integrated Army Equipment Modernization by Progressive Management
Cover of the book Vanguard of Valor: Strykers in Afghanistan - 1st Battalion, 17th Infantry Regiment in Kandahar Province 2009 - Stryker Brigade Combat Team, Combat Record, Foothold in the Arghandab by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy