Skylab Mission Report: Third Visit - Space Station Mission by Carr, Gibson, Pogue, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs, Comet Kohoutek

Nonfiction, Science & Nature, Technology, Aeronautics & Astronautics, Science, Physics, Astrophysics & Space Science
Cover of the book Skylab Mission Report: Third Visit - Space Station Mission by Carr, Gibson, Pogue, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs, Comet Kohoutek by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781476116945
Publisher: Progressive Management Publication: May 19, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781476116945
Publisher: Progressive Management
Publication: May 19, 2012
Imprint: Smashwords Edition
Language: English

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the third manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The third visit space vehicle was launched at 14:01:23 G.m.t. (9:01:23 a.m. e.s.t.) on November 16, 1973, from Launch Complex 39B at the Kennedy Space Center, Florida. The vehicle was manned by Lt. Col. Gerald P. Carr, Commander; Dr. Edward G. Gibson, Scientist Pilot; and Col. William R. Pogue, Pilot. The launch was originally scheduled for November 10, 1973; however, an inspection of the launch vehicle revealed cracks in the first stage fins and the decision to replace all of the fins necessitated the launch delay. The planned duration of the visit was 56 days with the option of extending it to a maximum of 84 days, which was achieved.

Orbital activities included four periods of extravehicular activity totaling approximately 22 1/4 hours. The first extravehicular activity was accomplished on visit day 7 and lasted 6 hours 34 minutes. The primary purpose of the activity — installation of film magazines in the Apollo Telescope Mount cameras — was accomplished satisfactorily. Other tasks accomplished included performing corrective maintenance on the experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) antenna, deploying panels of experiment D024 (Thermal Control Coatings), deploying impact detectors of experiment S149 (Particle Collection), deploying detector modules of experiment S228 (Trans-Uranic Cosmic Rays), and deploying collector assemblies of experiment S230 (Magnetospheric Particle Composition).

The second and third extravehicular activities were conducted on visit days 40 (Christmas Day) and 44 to allow extravehicular photography of the Comet Kohoutek prior to and after perihelion. The instruments for experiments S201 and T025 were used for this purpose. Experiment S020 (X-Ray/Ultraviolet Solar Photography) was also conducted on the second and third extravehicular activities. Other tasks performed during the visit day 40 extravehicular activity consisted of replacing film magazines in the Apollo Telescope Mount cameras, pinning open the door of experiment S082A (Extreme Ultraviolet Spectroheliograph), manually repositioning the filter wheel on experiment S054 (X-Ray Spectrographs Telescope), and retrieving experiment S149 impact detectors. The duration of the second extravehicular activity was 6 hours 54 minutes, and the duration of the third extravehicular activity was 3 hours 29 minutes.

The fourth and final extravehicular activity was performed on visit day 80. The major tasks accomplished consisted of retrieval of the Apollo Telescope Mount film, an additional performance of experiment S020, and performance of experiment T025. Other tasks consisted of retrieval of modules, panels, assemblies and samples that were to be returned to the ground for analysis, and deployment of cassettes and panels for potential retrieval in the future. The duration of the fourth extravehicular activity was 5 hours 19 minutes.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the third manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The third visit space vehicle was launched at 14:01:23 G.m.t. (9:01:23 a.m. e.s.t.) on November 16, 1973, from Launch Complex 39B at the Kennedy Space Center, Florida. The vehicle was manned by Lt. Col. Gerald P. Carr, Commander; Dr. Edward G. Gibson, Scientist Pilot; and Col. William R. Pogue, Pilot. The launch was originally scheduled for November 10, 1973; however, an inspection of the launch vehicle revealed cracks in the first stage fins and the decision to replace all of the fins necessitated the launch delay. The planned duration of the visit was 56 days with the option of extending it to a maximum of 84 days, which was achieved.

Orbital activities included four periods of extravehicular activity totaling approximately 22 1/4 hours. The first extravehicular activity was accomplished on visit day 7 and lasted 6 hours 34 minutes. The primary purpose of the activity — installation of film magazines in the Apollo Telescope Mount cameras — was accomplished satisfactorily. Other tasks accomplished included performing corrective maintenance on the experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) antenna, deploying panels of experiment D024 (Thermal Control Coatings), deploying impact detectors of experiment S149 (Particle Collection), deploying detector modules of experiment S228 (Trans-Uranic Cosmic Rays), and deploying collector assemblies of experiment S230 (Magnetospheric Particle Composition).

The second and third extravehicular activities were conducted on visit days 40 (Christmas Day) and 44 to allow extravehicular photography of the Comet Kohoutek prior to and after perihelion. The instruments for experiments S201 and T025 were used for this purpose. Experiment S020 (X-Ray/Ultraviolet Solar Photography) was also conducted on the second and third extravehicular activities. Other tasks performed during the visit day 40 extravehicular activity consisted of replacing film magazines in the Apollo Telescope Mount cameras, pinning open the door of experiment S082A (Extreme Ultraviolet Spectroheliograph), manually repositioning the filter wheel on experiment S054 (X-Ray Spectrographs Telescope), and retrieving experiment S149 impact detectors. The duration of the second extravehicular activity was 6 hours 54 minutes, and the duration of the third extravehicular activity was 3 hours 29 minutes.

The fourth and final extravehicular activity was performed on visit day 80. The major tasks accomplished consisted of retrieval of the Apollo Telescope Mount film, an additional performance of experiment S020, and performance of experiment T025. Other tasks consisted of retrieval of modules, panels, assemblies and samples that were to be returned to the ground for analysis, and deployment of cassettes and panels for potential retrieval in the future. The duration of the fourth extravehicular activity was 5 hours 19 minutes.

More books from Progressive Management

Cover of the book 2013 NASA Aerospace Safety Advisory Panel (ASAP) Annual Report, Issued January 2014 - International Space Station, Commercial Crew Risk and Budget, SpaceX, Exploration Program by Progressive Management
Cover of the book The Small War Manual (SWM) and Marine Corps Military Operations Other than War Doctrine - Relevance in the 21st Century, MOOTW, Operational History, World War II by Progressive Management
Cover of the book Joint Doctrine for Operations in Nuclear, Biological, and Chemical (NBC) Environments (Joint Publication 3-11) - Combat Operations, Health Service Support, Hazard Considerations by Progressive Management
Cover of the book Rebalance to the Pacific: Case for Greater Amphibious Capabilities in U.S. Army – Response to Geopolitical Tensions with China, Anti-access/Area Denial in Asia-Pacific, Operation Chromite Case Study by Progressive Management
Cover of the book Essential Guide to the Export-Import (Ex-Im) Bank: Debate on Reauthorization, Controversy, Critics and Supporters, Bank Reports and Documents, Annual Report and Plans by Progressive Management
Cover of the book Stability Economics: The Economic Foundations of Security in Post-conflict Environments - Iraq and Afghanistan, Shari'a Compliant Finance, Odierno, Petraeus, Shining Path Guerrillas by Progressive Management
Cover of the book NASA Space Technology Report: Pogo in Rockets and Launch Vehicles - Pogo Suppression, Experience with Gemini/Titan, Saturn V and Potential Catastrophic Structural Failure on Apollo 13 Mission by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: 2012 Department of Defense Dictionary of Military and Associated Terms, plus U.S. Marine Corps (USMC) Supplement to the Dictionary by Progressive Management
Cover of the book National Near-Earth Object Preparedness Strategy and Action Plan - Interagency Working Group for Detecting and Mitigating the Impact of Earth-Bound Near-Earth Objects (NEO) - Asteroids and Comets by Progressive Management
Cover of the book Global Trends Paradox of Progress: 2017 Report of the National Intelligence Council, Promise or Peril of the Future, War, Population, Energy, Climate, Terrorism, Populist Anti-Establishment Politics by Progressive Management
Cover of the book The "People" in the PLA: Recruitment, Training, and Education in China's Military - Chinese Military Career Profiles, Conscripts, Officer Corps, Command Colleges by Progressive Management
Cover of the book Battle on the Bookshelves: History, Desert Storm, and the United States Armed Forces - Defense Department Uses Various Versions of History to Shape Perceptions of Accomplishments, Influence Decisions by Progressive Management
Cover of the book Islamic State (ISIS) Recruiting in the West: How Dabiq Magazine Frames Recruitment Messages to Appeal to Westerners - Jihadi Terrorism Movement in Iraq and Syria, bin Laden, al-Qaeda and the Taliban by Progressive Management
Cover of the book 21st Century Peacekeeping and Stability Operations Institute (PKSOI) Papers - Mass Atrocity Prevention and Response Options (MAPRO): A Policy Planning Handbook - Stopping Genocide by Progressive Management
Cover of the book Skylab Mission Report: Saturn Workshop, Marshall Space Flight Center - Technical and Engineering Details of Station Hardware, Subsystems, Experiments, Missions, Crew Systems by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy