Operator's Guide to General Purpose Steam Turbines

An Overview of Operating Principles, Construction, Best Practices, and Troubleshooting

Nonfiction, Science & Nature, Technology, Machinery
Cover of the book Operator's Guide to General Purpose Steam Turbines by Robert X. Perez, David W. Lawhon, Wiley
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Robert X. Perez, David W. Lawhon ISBN: 9781119294467
Publisher: Wiley Publication: August 11, 2016
Imprint: Wiley-Scrivener Language: English
Author: Robert X. Perez, David W. Lawhon
ISBN: 9781119294467
Publisher: Wiley
Publication: August 11, 2016
Imprint: Wiley-Scrivener
Language: English

When installed and operated properly, general purpose steam turbines are reliable and tend to be forgotten, i.e., out of sound and out of mind. But, they can be sleeping giants that can result in major headaches if ignored. Three real steam turbine undesirable consequences that immediately come to mind are:

  • Injury and secondary damage due to an overspeed failure. An overspeed failure on a big steam or gas turbine is one of the most frightening of industrial accidents.
  • The high cost of an extensive overhaul due to an undetected component failure. A major steam turbine repair can cost ten or more times that of a garden variety centrifugal pump repair.
  • Costly production loses due an extended outage if the driven pump or compressor train is unspared. The value of lost production can quickly exceed repair costs.

A major goal of this book is to provide readers with detailed operating procedure aimed at reducing these risks to minimal levels. Start-ups are complicated by the fact that operators must deal with numerous start-up scenarios, such as:

  1. Commissioning a newly installed steam turbine
  2. Starting ups after a major steam turbine repair
  3. Starting up a proven steam turbine after an outage
  4. Overspeed trip testing

It is not enough to simply have a set of procedures in the control room for reference. To be effective, operating procedures must be clearly written down, taught, and practiced—until they become habit.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

When installed and operated properly, general purpose steam turbines are reliable and tend to be forgotten, i.e., out of sound and out of mind. But, they can be sleeping giants that can result in major headaches if ignored. Three real steam turbine undesirable consequences that immediately come to mind are:

A major goal of this book is to provide readers with detailed operating procedure aimed at reducing these risks to minimal levels. Start-ups are complicated by the fact that operators must deal with numerous start-up scenarios, such as:

  1. Commissioning a newly installed steam turbine
  2. Starting ups after a major steam turbine repair
  3. Starting up a proven steam turbine after an outage
  4. Overspeed trip testing

It is not enough to simply have a set of procedures in the control room for reference. To be effective, operating procedures must be clearly written down, taught, and practiced—until they become habit.

More books from Wiley

Cover of the book The World News Prism by Robert X. Perez, David W. Lawhon
Cover of the book The Radicality of Love by Robert X. Perez, David W. Lawhon
Cover of the book The Peebles Path to Real Estate Wealth by Robert X. Perez, David W. Lawhon
Cover of the book Adhesion in Microelectronics by Robert X. Perez, David W. Lawhon
Cover of the book Forensic Child Psychology by Robert X. Perez, David W. Lawhon
Cover of the book It's the Customer, Stupid! by Robert X. Perez, David W. Lawhon
Cover of the book Materials and Methods in ELT by Robert X. Perez, David W. Lawhon
Cover of the book The New Rules of Sales and Service by Robert X. Perez, David W. Lawhon
Cover of the book Leaders at All Levels by Robert X. Perez, David W. Lawhon
Cover of the book Entscheiden mit Drucker, Blanchard, Bennis & Co. by Robert X. Perez, David W. Lawhon
Cover of the book Scaffold Hopping in Medicinal Chemistry by Robert X. Perez, David W. Lawhon
Cover of the book Portfolio, Program, and Project Management in the Pharmaceutical and Biotechnology Industries by Robert X. Perez, David W. Lawhon
Cover of the book The Quest for Global Dominance by Robert X. Perez, David W. Lawhon
Cover of the book Interest Rate Markets by Robert X. Perez, David W. Lawhon
Cover of the book Fuel Cell Systems Explained by Robert X. Perez, David W. Lawhon
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy