Complete Guide to the Olmsted Locks and Dam on the Ohio River: Controversial In-the-Wet Construction Method, Inland Waterways Navigation Dams, Equipment, Designs, Financing

Nonfiction, Science & Nature, Technology, Engineering, Civil
Cover of the book Complete Guide to the Olmsted Locks and Dam on the Ohio River: Controversial In-the-Wet Construction Method, Inland Waterways Navigation Dams, Equipment, Designs, Financing by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781311588746
Publisher: Progressive Management Publication: October 29, 2013
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781311588746
Publisher: Progressive Management
Publication: October 29, 2013
Imprint: Smashwords Edition
Language: English

Beset by significant cost increases and mounting schedule delays, the Olmsted Locks and Dam project on the Ohio River has been in the news because of allegations that Senator Mitch McConnell (R, Kentucky), was involved in the inclusion of authorization for funding the project in the October 2013 bill ending the government shutdown. (Senator McConnell has denied the claim; the provision was added by Senators Lamar Alexander and Diane Feinstein.) This unique ebook provides an authoritative collection of official documents about the project and other inland waterways navigation dams.

The continuing growth in demand for water-borne commerce on the Ohio River requires periodic improvements in the waterways transportation infrastructure. Locks and Dams No. 52 and 53 located on the Ohio River between Paducah, Ky., and Cairo, Ill., were completed in 1929. Temporary 1,200-foot long lock chambers were added later. The antiquated design and age of these structures make it impossible to meet current traffic demands without significant delays.

Over the last five years tonnages have averaged 90 million tons at Locks and Dam 52 and 79 million tons at Locks and Dam 53. The U.S. Army Corps of Engineers and the navigation industry, in a continuing effort to provide for the nation's future navigation needs, will replace these aged facilities with one of the largest civil works projects undertaken by the Corps.

This new locks and dam project is under construction near the community of Olmsted, Ill. at River Mile 964.4. Construction of the Olmsted Locks and Dam Project was authorized by the U. S. Congress on Nov. 17, 1988, by passage of the Water Resources Development Act of 1988 (Public Law 100-676).

The cost of this project is being equally shared by congressional appropriation and the navigation industry.

Industry pays a tax on diesel fuel which goes to the Inland Waterways Trust Fund. The trust fund then pays 50 percent of the cost.

This strategic reach of the Ohio River provides a connection between the Ohio, Tennessee, Cumberland, and Mississippi rivers. The area has been described as the "hub" of the Ohio and Mississippi rivers waterway system. Barge traffic moving between the Mississippi River system and the Ohio, Tennessee, and Cumberland rivers must pass through this stretch of river. More tonnage passes this point than any other place in America's inland navigation system. This is a critical reach of water from a commercial navigation perspective.

The Olmsted project will consist of two 110-foot by 1,200-foot lock chambers located along the Illinois shoreline. The dam will consist of tainter gates, a navigable pass section and a fixed weir.

In a raised position the wickets will maintain the required navigable depths from the Olmsted project upstream to Smithland Locks and Dam. When river flows are sufficient, the wickets can be lowered to lay flat on the river bottom and allow traffic to navigate over the dam without passing through the locks. This reduces delays experienced by locking through the system.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

Beset by significant cost increases and mounting schedule delays, the Olmsted Locks and Dam project on the Ohio River has been in the news because of allegations that Senator Mitch McConnell (R, Kentucky), was involved in the inclusion of authorization for funding the project in the October 2013 bill ending the government shutdown. (Senator McConnell has denied the claim; the provision was added by Senators Lamar Alexander and Diane Feinstein.) This unique ebook provides an authoritative collection of official documents about the project and other inland waterways navigation dams.

The continuing growth in demand for water-borne commerce on the Ohio River requires periodic improvements in the waterways transportation infrastructure. Locks and Dams No. 52 and 53 located on the Ohio River between Paducah, Ky., and Cairo, Ill., were completed in 1929. Temporary 1,200-foot long lock chambers were added later. The antiquated design and age of these structures make it impossible to meet current traffic demands without significant delays.

Over the last five years tonnages have averaged 90 million tons at Locks and Dam 52 and 79 million tons at Locks and Dam 53. The U.S. Army Corps of Engineers and the navigation industry, in a continuing effort to provide for the nation's future navigation needs, will replace these aged facilities with one of the largest civil works projects undertaken by the Corps.

This new locks and dam project is under construction near the community of Olmsted, Ill. at River Mile 964.4. Construction of the Olmsted Locks and Dam Project was authorized by the U. S. Congress on Nov. 17, 1988, by passage of the Water Resources Development Act of 1988 (Public Law 100-676).

The cost of this project is being equally shared by congressional appropriation and the navigation industry.

Industry pays a tax on diesel fuel which goes to the Inland Waterways Trust Fund. The trust fund then pays 50 percent of the cost.

This strategic reach of the Ohio River provides a connection between the Ohio, Tennessee, Cumberland, and Mississippi rivers. The area has been described as the "hub" of the Ohio and Mississippi rivers waterway system. Barge traffic moving between the Mississippi River system and the Ohio, Tennessee, and Cumberland rivers must pass through this stretch of river. More tonnage passes this point than any other place in America's inland navigation system. This is a critical reach of water from a commercial navigation perspective.

The Olmsted project will consist of two 110-foot by 1,200-foot lock chambers located along the Illinois shoreline. The dam will consist of tainter gates, a navigable pass section and a fixed weir.

In a raised position the wickets will maintain the required navigable depths from the Olmsted project upstream to Smithland Locks and Dam. When river flows are sufficient, the wickets can be lowered to lay flat on the river bottom and allow traffic to navigate over the dam without passing through the locks. This reduces delays experienced by locking through the system.

More books from Progressive Management

Cover of the book Wings in Orbit: Scientific and Engineering Legacies of the Space Shuttle - Select Astronaut Observations and Highlights of Shuttle Program Payloads and Experiments Supplement (NASA TM-2011-216150) by Progressive Management
Cover of the book The Cold War and Beyond: Chronology of the United States Air Force, 1947-1997 - Aviation and Space Milestones of the First Fifty Years of the USAF by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Leadership for American Army Leaders - FMFRP 12-17 (Value-Added Professional Format Series) by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Air Force C-130J Super Hercules Transport Aircraft - Operations Procedures, Aircrew Evaluation Criteria, Aircrew Training Flying Operations by Progressive Management
Cover of the book Answering the Call: A Commemorative Tribute to Military Nursing in World War I - The U.S. Army Nurse Corps, 1917-1919 - Hospitals, Ambulances, Trains, African-American Nurses, Swine Flu Epidemic by Progressive Management
Cover of the book Apollo and America's Moon Landing Program: Apollo 10 Official NASA Mission Reports and Press Kit - 1969 LM Test Flight in Lunar Orbit by Astronauts Stafford, Cernan, and Young by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Guide to Services Contingency Planning: Beddown (Air Force Handbook 10-247, Volume 1) - BEAR Systems, Prime RIBS, Shelters and Tents by Progressive Management
Cover of the book Deception: Theory and Practice - Military Deception, Army Doctrine, World War II, Vietnam, Desert Storm, Post Cold War, Surprise, Freedom of Action, Mislead the Target, Subversion, Mental Isolation by Progressive Management
Cover of the book History of the Office of the Secretary of Defense, Volume Two: The Test of War, 1950-1953 - Pentagon's Role in the Korean War, the Recall of MacArthur, Hydrogen Bomb, Truman, NATO by Progressive Management
Cover of the book Air Force Doctrine Document 3-13.1: Electronic Warfare, Electronic Attack, Electronic Protection, Disruption, EW and Major Battles (Normandy Landing, Vietnam, Desert Storm) by Progressive Management
Cover of the book Praetorian STARShip: The Untold Story of the Combat Talon Special Forces Operations - Infiltration, Exfiltration, Surface to Air Recovery System, Fulton Recovery, Iranian Rescue, Vietnam, Desert Storm by Progressive Management
Cover of the book U.S. Marines in Humanitarian Operations: On Mamba Station - U.S. Marines in West Africa, 1990 - 2003, Civil War in Liberia, Samuel Doe, Evacuation Operations, Sharp Edge, Assured Response by Progressive Management
Cover of the book Genocide and Airpower: Holocaust, Interventions on Humanitarian Grounds, Somalia, Bosnia, Kosovo, Iraq, Darfur, Defining Genocide, Nuremberg, Convention, United Nations Action, ISR Support by Progressive Management
Cover of the book Preventing and Managing Conflict in an Unstable World: Iran, Rio Gangs, Iraq, Afghanistan, Taliban, Moldova, World War II, Rwanda, Child Soldiering, Japan Foreign Policy, Foreign Aid, Post-Conflict by Progressive Management
Cover of the book 21st Century Pediatric Cancer Sourcebook: Childhood Ependymoma, Subependymoma - Clinical Data and Practical Information for Patients, Families, and Physicians by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy