Apollo and America's Moon Landing Program: Apollo 13 Technical Crew Debriefing with Unique Observations about the Aborted Mission - Astronauts Lovell, Haise, and Swigert

Nonfiction, Science & Nature, Science, Physics, Astronomy, History, Americas
Cover of the book Apollo and America's Moon Landing Program: Apollo 13 Technical Crew Debriefing with Unique Observations about the Aborted Mission - Astronauts Lovell, Haise, and Swigert by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781465705099
Publisher: Progressive Management Publication: December 10, 2011
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781465705099
Publisher: Progressive Management
Publication: December 10, 2011
Imprint: Smashwords Edition
Language: English

This official NASA document - converted for accurate flowing-text ebook format reproduction - provides the complete transcription of the Apollo 13 post-flight debriefing given by astronauts Lovell, Haise, and Swigert, with their first-hand description of the harrowing flight. This ebook is an invaluable addition to the library of anyone interested in the Apollo moon landings.

Contents include: SUITING AND INGRESS * STATUS CHECKS AND COUNTDOWN * POWERED FLIGHT * EARTH ORBIT AND SYSTEMS CHECKOUT * TLI THROUGH S-IVB CLOSEOUT * TRANSLUNAR COAST * LUNAR MODULE FAMILIARIZATION * SPACECRAFT EMERGENCY * LUNAR FLYBY THROUGH 2-HOUR MANEUVER * TRANSEARTH COAST * ENTRY * LANDING AND RECOVERY * COMMAND AND SERVICE MODULE SYSTEMS OPERATIONS * LUNAR MODULE SYSTEMS OPERATIONS * FLIGHT DATA FILE * FLIGHT EQUIPMENT AND GOVERNMENT-FURNISHED EQUIPMENT * VISUAL SIGHTINGS * PREMISSION PLANNING * MISSION CONTROL * TRAINING * HUMAN FACTORS

Apollo 13 was supposed to land in the Fra Mauro area. An explosion on board forced Apollo 13 to circle the moon without landing. The Fra Mauro site was reassigned to Apollo 14.
At 5 1/2 minutes after liftoff, John Swigert, Fred Haise and James Lovell felt a little vibration. Then the center engine of the S-II stage shut down two minutes early. This caused the remaining four engines to burn 34 seconds longer than planned, and the S-IVB third stage had to burn nine seconds longer to put Apollo 13 in orbit.

Days before the mission, backup lunar module pilot, Charles Duke, inadvertently exposed the crew to German measles. Command Module Pilot Ken Mattingly had no immunity to measles and was replaced by backup command module pilot, John Swigert.

Ground tests before launch indicated the possibility of a poorly insulated supercritical helium tank in the lunar module, or LM, descent stage, so the flight plan was modified to enter the LM three hours early in order to obtain an onboard readout of helium tank pressure.

The No. 2 oxygen tank, serial number 10024X-TA0009, had been previously installed in the service module of Apollo 10, but was removed for modification and damaged in the process. The tank was fixed, tested at the factory, installed in the Apollo 13 service module and tested again during the Countdown Demonstration Test at NASA's Kennedy Space Center beginning March 16, 1970. The tanks normally are emptied to about half full. No. 1 behaved all right, but No. 2 dropped to only 92 percent of capacity. Gaseous oxygen at 80 pounds per square inch was applied through the vent line to expel the liquid oxygen, but to no avail. An interim discrepancy report was written, and on March 27, two weeks before launch, detanking operations resumed. No. 1 again emptied normally, but No. 2 did not. After a conference with contractor and NASA personnel, the test director decided to "boil off" the remaining oxygen in No. 2 by using the electrical heater within the tank. The technique worked, but it took eight hours of 65-volt DC power from the ground support equipment to dissipate the oxygen. Due to an oversight in replacing an underrated component during a design modification, this turned out to severely damage the internal heating elements of the tank.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This official NASA document - converted for accurate flowing-text ebook format reproduction - provides the complete transcription of the Apollo 13 post-flight debriefing given by astronauts Lovell, Haise, and Swigert, with their first-hand description of the harrowing flight. This ebook is an invaluable addition to the library of anyone interested in the Apollo moon landings.

Contents include: SUITING AND INGRESS * STATUS CHECKS AND COUNTDOWN * POWERED FLIGHT * EARTH ORBIT AND SYSTEMS CHECKOUT * TLI THROUGH S-IVB CLOSEOUT * TRANSLUNAR COAST * LUNAR MODULE FAMILIARIZATION * SPACECRAFT EMERGENCY * LUNAR FLYBY THROUGH 2-HOUR MANEUVER * TRANSEARTH COAST * ENTRY * LANDING AND RECOVERY * COMMAND AND SERVICE MODULE SYSTEMS OPERATIONS * LUNAR MODULE SYSTEMS OPERATIONS * FLIGHT DATA FILE * FLIGHT EQUIPMENT AND GOVERNMENT-FURNISHED EQUIPMENT * VISUAL SIGHTINGS * PREMISSION PLANNING * MISSION CONTROL * TRAINING * HUMAN FACTORS

Apollo 13 was supposed to land in the Fra Mauro area. An explosion on board forced Apollo 13 to circle the moon without landing. The Fra Mauro site was reassigned to Apollo 14.
At 5 1/2 minutes after liftoff, John Swigert, Fred Haise and James Lovell felt a little vibration. Then the center engine of the S-II stage shut down two minutes early. This caused the remaining four engines to burn 34 seconds longer than planned, and the S-IVB third stage had to burn nine seconds longer to put Apollo 13 in orbit.

Days before the mission, backup lunar module pilot, Charles Duke, inadvertently exposed the crew to German measles. Command Module Pilot Ken Mattingly had no immunity to measles and was replaced by backup command module pilot, John Swigert.

Ground tests before launch indicated the possibility of a poorly insulated supercritical helium tank in the lunar module, or LM, descent stage, so the flight plan was modified to enter the LM three hours early in order to obtain an onboard readout of helium tank pressure.

The No. 2 oxygen tank, serial number 10024X-TA0009, had been previously installed in the service module of Apollo 10, but was removed for modification and damaged in the process. The tank was fixed, tested at the factory, installed in the Apollo 13 service module and tested again during the Countdown Demonstration Test at NASA's Kennedy Space Center beginning March 16, 1970. The tanks normally are emptied to about half full. No. 1 behaved all right, but No. 2 dropped to only 92 percent of capacity. Gaseous oxygen at 80 pounds per square inch was applied through the vent line to expel the liquid oxygen, but to no avail. An interim discrepancy report was written, and on March 27, two weeks before launch, detanking operations resumed. No. 1 again emptied normally, but No. 2 did not. After a conference with contractor and NASA personnel, the test director decided to "boil off" the remaining oxygen in No. 2 by using the electrical heater within the tank. The technique worked, but it took eight hours of 65-volt DC power from the ground support equipment to dissipate the oxygen. Due to an oversight in replacing an underrated component during a design modification, this turned out to severely damage the internal heating elements of the tank.

More books from Progressive Management

Cover of the book Air Force Reserve Year in Review, 2015 and 2014: Covers Command, Tenth, Twenty-second, and Fourth Air Force, Yellow Ribbon Program, Global Vigilance with MQ-9 Reaper, 489th Bomb Group's B-1 Lancer by Progressive Management
Cover of the book World War II Japanese American Internment Reports: Personal Justice Denied, The Complete Official Report of the Commission on Wartime Relocation and Internment of Civilians, Aleuts, Recommendations by Progressive Management
Cover of the book The Revolutionary United Front (RUF) and Child Soldiers During Sierra Leone's Civil War - Use of Drugged Soldiers to Commit Horrific Atrocities During Guerilla War, Involvement of Libya and Gadhafi by Progressive Management
Cover of the book NATO's Air War in Libya: A Template for Future American Operations - Operation Unified Protector, Operation Odyssey Dawn, Air Power, Afghan Model, Limited Boots On Ground (LBoG) Model by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Air Force F-16 Fighting Falcon Fighter Aircraft - Operations Procedures, Aircrew Evaluation Criteria, Aircrew Training Flying Operations by Progressive Management
Cover of the book Det One: U.S. Marines Corps U.S. Special Operations Command Detachment 2003-2006 - Global War on Terrorism, Iraq War and Operation Iraqi Freedom, Marine Expeditionary Force by Progressive Management
Cover of the book National Defense Intelligence College Paper: Intelligence in the Rum War at Sea, 1920-1933 - Prohibition and the Coast Guard, Volstead Act, Al Capone, Mafia, J. Edgar Hoover, FDR by Progressive Management
Cover of the book Fire Monitoring Handbook (FMH Fire Management Program Center, National Interagency Fire Center) Part 1 - Wildfire and Wildland Fire Environmental and Fire Observation, Vegetation Monitoring Protocols by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: U.S. Marine Corps (USMC) Pistol Marksmanship Marine Corps Reference Publication (MCRP) 3-01B by Progressive Management
Cover of the book 2014 U.S. Intelligence Community Worldwide Threat Assessment: Clapper Testimony: Cyber Threats, Iran, Nuclear Weapons, Terrorism, al-Qaida, Jihad, WMD, North Korea, Syria, Afghanistan by Progressive Management
Cover of the book 21st Century Chinese Military Issues: People's Republic of China's Nuclear Force Modernization - Command and Control, Undersea Nuclear Forces, BMD Countermeasures, Chinese Space Program by Progressive Management
Cover of the book The Report of the Presidential Commission on the Space Shuttle Challenger Accident: The Tragedy of Mission 51-L in 1986 - Volume One of the Rogers Commission Report by Progressive Management
Cover of the book Complete Guide to Weather Satellites: NOAA Polar and Geostationary Satellites, GOES, POES, JPSS, DMSP, Potential Critical Gaps in Data, Program History, Military and Earth Observation, Forecasting by Progressive Management
Cover of the book The Report of the Presidential Commission on the Space Shuttle Challenger Accident: The Tragedy of Mission 51-L in 1986 - Volume Two, Appendix E, F, G, H, I, J, and K, including Feynman Analysis by Progressive Management
Cover of the book The Eagle's Talons: The American Experience at War - U.S. War History, American Revolution, Civil War, World War I, World War II, Korean War, Vietnam War, America's Minor Wars by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy